CMRA 2012 Year end report

CMRA Year 2012 in brief: January 2012 Opening Balance $6084.59 Presentation Booklet for Highway 19 interchange mailed to Minister of Transportation and Infrastructure waiting reply. February 2012 Minister of Transportation responds to Presentation Booklet and sets in Motion a meeting. CMRA sets up an account for bottles at the Qualicum Recycle depot Halloween event post

CMRA 2012 Year end report Read More »

CMRA ready to Fundraise for Highway 19 interchange engineering Study

The Ministry of Transportation and Infrastructure (MOT) asked the Corcan Meadowood Residents Association (CMRA) to submit engineering details and costs associated with highway access to Highway 19 from Corcan and Nahmint ( see tentative access map in link below) This Engineering study must be completed before the property owners can vote in a referendum. The

CMRA ready to Fundraise for Highway 19 interchange engineering Study Read More »

Scroll to Top